
Installation into concrete
1. Turn the post upside down on a hard surface and prepare to drill
larger holes in base plate.
Enlarge the (4) existing post base plate holes to 5/16” (using a 5/16”
drill bit).
2. Determine the 3”x3” post location(s). Spacing between posts should
be 6’ or less to meet IBC codes when installed 24” or higher above
the ground.
3. We recommend the edge of the 5”x5” base plate is fastened at least
1 ½” in from the edge of any concrete face (assuming normal weight
concrete).
4. Square up the post with the concrete surface and mark all (4) holes
with a marker.
5. At your (4) marks, drill a 1/4” to 3 ½” or deeper hole into the
concrete using a masonry bit.
6. Fasten post in place with provided ¼” x 3” Powers Wedge Bolts
7. Begin tightening the anchor with socket wrench or impact wrench by
rotating clockwise and applying pressure in toward the concrete.
8. Continue tightening the anchor until the head is firmly seated against
the post base plate. (Do not over tighten).
9. Slide on optional post base cover to hide fasteners.
Attach post cap after railing has been installed using 1” fasteners
provided.
www.ezhandrail.com for videos 9
Comentários a estes Manuais