
Installing the Upper Assembly
1. The inside dimension of the upper Top Glass Channel Assembly and the lower
Bottom Glass Channel Assembly must be installed exactly 28” apart for the
Glass Balusters to fit properly for residential railings (34” for commercial
railings).
Suggestion: Cut (2) 2x4’s at 28” (if you have not already done so). Place the
2x4’s on end between the assemblies for proper spacing of the Top Assembly.
(Illustration #7). Use 34” 2x4’s for commercial height railing.
2. After locating the placement of the Top Post Mounts, fasten the mounts to the
post using the appropriate fasteners (J, M, N). (See previous post detail).
3. Place a third fastener (J) through the side of the Top Post Mount E) securing the
Top Glass Channel Assembly to the Top Post Mount. This fastener should be
placed on the outside (non viewable side) of the railing as indicated below.
Repeat at the opposite end.
J, M, or N – see previous
post detail page for
appropriate fasteners
28” Residential
34” Commercial
www.ezhandrail.com for videos 13
Comentários a estes Manuais